Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work

Product Details
Customization: Available
Material: Aluminium
Type: Mobile
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2009

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2004-04-06
Management System Certification
ISO9001:2015
  • Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work
  • Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work
  • Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work
  • Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work
  • Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Installation Process
  • Packaging & Shipping
  • Company Profile
Overview

Basic Info.

Model NO.
YYRS
Framework
Combined Scaffolding
Supporting Mode
Floor Type Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding System
Construction Properties
Installation Scaffold
Surface
Hot Dipped Galvanized
Certification
En12811
Style
Aluminium Scaffolding Tower
Power Source
Manual
Transport Package
Pallet
Specification
Ringlock System
Trademark
Yue Yang
Origin
Jiangsu, China
HS Code
7308400000
Production Capacity
200ton/Month

Packaging & Delivery

Package Size
100.00cm * 100.00cm * 100.00cm
Package Gross Weight
50.000kg

Product Description

Aluminium Cuplock Ringlock Scaffolding System for Aerial Work Construction
 

Product Description

 
Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work
1-High Grade Aluminium takes heavy loading capacity, get to 4.4kN.

2-Light Weight makes high work effective.

3-Special design for aerial using, easy installation, less labour force, economic cost.

4-More items for more possibilities.

5-Aluminium ringlock scaffolding tower and more sizes can be customized.

6-
Sample Model left: 5m(H)X2.07m(L)X1.40m(W)

 

 

Detailed Photos

Detailed Photos of Ringlock Scaffolding System
Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work
Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work
 

Installation Process

Installation Details of Ringlock Scaffolding System
Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work

Put adjustable base jack on the ground, followed by the base collars, with the thinner tube downwards onto the adjustable base jack.   The recommended height for the adjustable base jack extension is 20 cm. Begin erecting at the ground's highest point. In the first bay connect the single ledger (A)m and single ledgers (B)m to the small holes of the base collars. Check the assembled frame and ensure that it is level and square.
Note: Anchor the base jack to the ground.



Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work

Place the standards 2.0m over the adjustable base jack onto the base collars.    Install the second floor single ledgers at a 2m height (4 rosette spacings). The specifications of Single ledgers follow the first floor bays.


Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work

Put the stairway to the section you want at the 2.0m height.  Install the diagonal bracing according to plan.Meanwhile, secure all the wedges of single ledgers and diagonal braces with hammer.


Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work

Install the internal handrail on to stair way. Installing the plank beside the stairway. Lock the planks to the single ledgers with the lock plate at the back of planks.


Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work

Repeat the step 1-4 for upper section install.TIP: When putting the standards on top of each other, turn them so that they can(if necessary) be connected to one another with locking pins.  Install the second stairway from the second floor to third foor. Repeat the step 5-6 to install the handrail and planks.Flow up with others parts as plan if have customize design.
 

Packaging & Shipping

Packing & Shipping of Ringlock Scaffolding System
Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work
Product process of Ringlock Scaffolding System
Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work

Company Profile

Company Profile
Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work
Aluminium or Galvanized Cuplock Ringlock Scaffolding System for Construction Aerial Work

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier