Material: | Aluminium |
---|---|
Type: | Mobile |
Structural Style: | Tower Scaffolding |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Installation Details
Put adjustable base jack on the ground, In the first bay connect the single ledger (A)m and
followed by the base collars, with the thinner tube single ledgers (B)m to the small holes of the base
downwards onto the adjustable base jack. collars. Check the assembled frame and ensure that
The recommended height for the adjustable base it is level and square.
jack extension is 20 cm. Begin erecting at the Note: Anchor the base jack to the ground.
ground's highest point.
Place the standards 2.0m over the adjustable base Install the second floor single ledgers at a 2m
jack onto the base collars. height (4 rosette spacings).
The specifications of Single ledgers follow the first floor bays.
Put the stairway to the section you want at the 2.0m height. Install the diagonal bracing according to plan.Meanwhile, secure all
Meanwhile, securethe wedges of single ledgers and diagonal braces
with hammer.
Install the internal handrail on to stair way. Installing the plank beside the stairway. Lock the planks to the
single ledgers with the lock plate at the back of planks.
Repeat the step 1-4 for upper section install.TIP: When putting Install the second stairway from the second floor to third foor.
thestandards on top of each other, turn them so that they can, Repeat the step 5-6 to install the handrail and planks.
(if necessary), be connected to one another with locking pins. Flow up with others parts as plan if have customize design.
Packing & Shipping
Product process
Company Profile
Suppliers with verified business licenses